First Meeting Minutes
Project: Hiking Logbook
Date: 08 August 2025
Time: 48 minutes 23 seconds
Platform: WhatsApp Video Call
Minute Taker: Ntokozo Skosana
Attendees
- Present: Ntokozo, Risuna, Naledi, Annah
- Absent: Jane
Agenda
- Review and discussion of Sprint 1 rubric.
- Identify expectations for 100% achievement in Sprint 1.
- Discuss project tech stack, structure, and tools.
- Allocate initial tasks and responsibilities.
Discussion Summary
1. Sprint 1 Rubric Review
- Version Control:
- Use GitHub for repository hosting.
- Maintain a proper
README.md
with project details, installation instructions, usage guide, and contribution guidelines.
- Apply code quality tools (Prettier, ESLint for JS/React, possible GitHub Actions for automated linting).
- Work Planning:
- Set up GitHub Projects for sprint tracking (Kanban board with “To Do”, “In Progress”, “Done”).
- Track progress using issues and milestones.
- Prototyping:
- Create a wireframe in Figma.
- Testing:
- Plan for basic unit tests and UI testing before submission.
2. Project Tech Stack Confirmation
- Frontend: React.js with Tailwind CSS
- Backend/Database/Authentication: Firebase
- Design Tool: Figma
- Version Control: GitHub with branching strategy
3. Initial Tasks
- Ntokozo: Minutes, setup GitHub Project for Work Planning
- Risuna: Firebase account, Repo, Branch rules
- Naledi: CI/CD Workflow, testing tools, Codecov badge
- Annah: Notion setup
- All: Documentation of Tech stack, Wireframes
4. Absent Member
- Jane will be updated and assigned Sprint 1 tasks.
Decisions Made
- Figma structure will match the discussed layout.
- GitHub Projects will be set up before the next meeting.
README.md
must include description, installation, usage, and contribution process.
Next Meeting: 11 August 2025
Second Meeting Minutes - Website Layout Discussion
Date: 11 August 2025
Time: 36 minutes 9 seconds
Platform: WhatsApp call
Attendees
- Ntokozo
- Risuna
- Annah
- Jane
Absent: Naledi
Agenda
- Presentation and discussion of proposed website layouts.
- Selection of final layout for project.
- Assignment of related tasks.
Discussion Points
1. Presentation of Layout Ideas
- All present members shared their proposed website layouts.
2. Selection of Final Layout
- The team decided to proceed with Risuna’s layout in Figma.
3. Task Assignments
- Risuna – Finalize and refine the chosen wireframe in Figma.
- Ntokozo – Write the project’s
README.md
.
- Jane – Draft backlog items for discussion in the next meeting.
- Annah – Shared layout ideas using Lovable.
Next Steps
- Finalize wireframe in Figma.
- Review and discuss backlog items drafted by Jane in the next meeting.